Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Carbon Seals and Bearings
NAICS
n/a
SIC 3568: Mechanical Power Transmission Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 55,000
ft2
Annual Production 600,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Rhode Island

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $405,593 6,592,907
kWh
Electricity Demand $36,016 12,720
kW-mo/yr
Electricity Fees $3,134 -
Natural Gas $82,243 16,113
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $118,531 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,769

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings By-product Production Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $69,572 $286,600 $88,211
1,379,543
kWh
$7,191
-
kW-mo/yr
$(-25,830.0)
-
MMBtu
-
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $22,135 $42,000 $27,923
436,694
kWh
$2,377
-
kW-mo/yr
$(-8,165.0)
-
MMBtu
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,240 $26,115 $6,240
97,597
kWh
- - -
04 2.2692: Use outside cold water source as a supply of cooling water $5,388 $13,800 $4,966
77,667
kWh
$422
-
kW-mo/yr
- -
05 2.7313: Recycle air for heating, ventilation and air conditioning $4,828 $1,960 $2,755
43,083
kWh
- $7,353
-
MMBtu
$(-5,280.0)
06 2.7142: Utilize higher efficiency lamps and/or ballasts $4,880 $32,900 $4,498
70,340
kWh
$382
-
kW-mo/yr
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,435 $300 $2,435
45,721
kWh
- - -
08 2.4221: Install compressor air intakes in coolest locations $1,423 $1,070 $1,423
22,274
kWh
- - -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $815 $3,075 $750
11,723
kWh
$65
-
kW-mo/yr
- -
10 2.4231: Reduce the pressure of compressed air to the minimum required $815 $300 $750
11,723
kWh
$65
-
kW-mo/yr
- -
TOTAL RECOMMENDED $118,531 $408,120 $139,951
2,196,365
kWh
$10,502
-
kW-mo/yr
$(-26,642.0)
-
MMBtu
$(-5,280.0)
TOTAL IMPLEMENTED $19,769 $50,330 $16,827
270,808
kWh
$869
-
kW-mo/yr
$7,353
-
MMBtu
$(-5,280.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs