Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product CHILDREN'S SPORTSWEAR
NAICS
n/a
SIC 2321: Men's and Boys' Shirts, Except Work Shirts
Sales Range $1
M
to 5
M
# of Employees 380
Plant Area
n/a
Annual Production 1,080,000
pieces
Production Hrs. Annual 2,185
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,770 956,917
kWh
Fuel Oil #2 $4,100 700
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,522 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,522

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.2163: Use minimum steam operating pressure $1,745 $2,550 - $1,745
-
MMBtu
-
02 2.7111: Reduce illumination to minimum necessary levels $2,163 $240 $2,058
34,877
kWh
- $105
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,504 $3,650 $1,504
25,498
kWh
- -
04 2.2122: Install / repair insulation on condensate lines $117 $115 - $117
-
MMBtu
-
05 2.4221: Install compressor air intakes in coolest locations $173 $410 $173
2,931
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $35 $128 $603
10,258
kWh
- $(-568.0)
07 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,785 - $2,785
-
kWh
- -
TOTAL RECOMMENDED $8,522 $7,093 $7,123
73,564
kWh
$1,862
-
MMBtu
$(-463.0)
TOTAL IMPLEMENTED $8,522 $7,093 $7,123
73,564
kWh
$1,862
-
MMBtu
$(-463.0)