| Assessment Year | 1991 |
|---|---|
| Principal Product | PRE-COOKED FOOD PRODUCTS |
| NAICS |
n/a
|
| SIC | 2013: Sausages and Other Prepared Meat Products |
| Sales Range | $10 M to 50M |
| # of Employees | 293 |
| Plant Area |
n/a
|
| Annual Production | 13,700,000
lb
|
| Production Hrs. Annual | 5,460
hrs
|
| Location (State) | Tennessee |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $497,781 | 9,837,925 |
kWh
|
$0.051 |
| Natural Gas | $148,273 | 33,772 |
MMBtu
|
$4.39 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $22,285 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2447: Heat water with exhaust heat | $15,356 | $31,200 | - |
$15,356
-
MMBtu
|
|
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,377 | - |
$2,377
46,600
kWh
|
- | |
| 03 | 2.7261: Install timers and/or thermostats | $2,926 | $1,200 |
$2,926
57,444
kWh
|
- | |
| 04 | 2.4312: Improve lubrication practices | $854 | $420 |
$854
16,706
kWh
|
- | |
| 05 | 2.2122: Install / repair insulation on condensate lines | $290 | $25 | - |
$290
-
MMBtu
|
|
| 06 | 3.6122: Install solid waste incinerator for heat | $272 | $142 | - |
$272
-
MMBtu
|
|
| 07 | 2.2511: Insulate bare equipment | $210 | $335 |
$210
4,103
kWh
|
- | |
| TOTAL RECOMMENDED | $22,285 | $33,322 |
$6,367
124,853
kWh
|
$15,918
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs