ITAC Assessment: RU0085
ITAC logo
ITAC Assessment: RU0085
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product SPICES AND EXTRACTS
NAICS
n/a
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 225
Plant Area
n/a
Annual Production 48,000,000
pieces
Production Hrs. Annual 6,120
hrs
Location (State) Maryland

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $407,459 7,575,029
kWh
Natural Gas $126,735 26,873
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,101 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,720

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $7,252 - $7,252
134,232
kWh
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $2,206 $500 - $2,206
-
MMBtu
03 2.4133: Use most efficient type of electric motors $4,262 $10,620 $4,262
78,839
kWh
-
04 2.6212: Turn off equipment during breaks, reduce operating time $2,370 - $2,370
43,962
kWh
-
05 2.2414: Use waste heat from hot flue gases to preheat $13,011 $11,500 - $13,011
-
MMBtu
TOTAL RECOMMENDED $29,101 $22,620 $13,884
257,033
kWh
$15,217
-
MMBtu
TOTAL IMPLEMENTED $13,720 $11,120 $11,514
213,071
kWh
$2,206
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs