ITAC Assessment: TN0426
ITAC logo
ITAC Assessment: TN0426
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product HAMS, SHOULDERS, SAUSAGE
NAICS
n/a
SIC 2011: Meat Packing Plants
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area
n/a
Annual Production 20,000,000
lb
Production Hrs. Annual 5,304
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $198,140 4,667,058
kWh
Natural Gas $84,624 18,392
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,887 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,887

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2163: Use minimum steam operating pressure $10,911 $500 - $10,911
-
MMBtu
02 2.1233: Analyze flue gas for proper air/fuel ratio $1,789 $1,000 - $1,789
-
MMBtu
03 2.2122: Install / repair insulation on condensate lines $897 $25 - $897
-
MMBtu
04 2.2136: Install / repair insulation on steam lines $327 $45 - $327
-
MMBtu
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $455 $400 $455
10,844
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $360 $940 $360
8,499
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $345 $556 $345
8,206
kWh
-
08 2.3212: Optimize plant power factor $803 $1,375 $803
-
kWh
-
TOTAL RECOMMENDED $15,887 $4,841 $1,963
27,549
kWh
$13,924
-
MMBtu
TOTAL IMPLEMENTED $15,887 $4,841 $1,963
27,549
kWh
$13,924
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs