| Assessment Year | 2015 |
|---|---|
| Principal Product | Precision machining |
| NAICS | 332710: Machine Shops |
| SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
| Sales Range | $50 M to 100M |
| # of Employees | 109 |
| Plant Area |
227,500
ft2
|
| Annual Production | 21,530
pieces
|
| Production Hrs. Annual | 2,490
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $546,031 | 8,941,947 |
kWh
|
$0.061 |
| Electricity Demand | $173,415 | 24,909 |
kW-mo/yr
|
$6.96 |
| Electricity Fees | $3,884 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $88,580 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $17,950 | $12,830 | - | - |
$(-3,650.0)
-
MMBtu
|
$21,600 | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $17,320 | $2,000 |
$9,900
170,600
kWh
|
$7,420
-
kW-mo/yr
|
- | - | |
| 03 | 2.3212: Optimize plant power factor | $14,550 | $31,640 | - |
$14,550
-
kW-mo/yr
|
- | - | |
| 04 | 2.3212: Optimize plant power factor | $11,210 | $21,860 | - |
$11,210
-
kW-mo/yr
|
- | - | |
| 05 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $8,400 | $9,800 | - | - | - | $8,400 | |
| 06 | 2.4322: Use or replace with energy efficient substitutes | $8,190 | $10,960 |
$4,670
80,500
kWh
|
$3,520
-
kW-mo/yr
|
- | - | |
| 07 | 2.3212: Optimize plant power factor | $4,570 | $11,330 | - |
$4,570
-
kW-mo/yr
|
- | - | |
| 08 | 2.7135: Install occupancy sensors | $4,060 | $1,270 |
$4,060
69,950
kWh
|
- | - | - | |
| 09 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,330 | $30 |
$1,330
22,965
kWh
|
$1,000
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $88,580 | $101,720 |
$19,960
344,015
kWh
|
$42,270
-
kW-mo/yr
|
$(-3,650.0)
-
MMBtu
|
$30,000 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs