| Assessment Year | 1991 |
|---|---|
| Principal Product | DRILL CHUCKS |
| NAICS |
n/a
|
| SIC | 3545: Cutting Tools, Machine Tool Accessories, and Machinists' Precision Measuring Devices |
| Sales Range | $50 M to 100M |
| # of Employees | 445 |
| Plant Area |
n/a
|
| Annual Production | 8,000,000
pieces
|
| Production Hrs. Annual | 7,344
hrs
|
| Location (State) | South Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $518,517 | 10,741,794 |
kWh
|
$0.048 |
| Natural Gas | $72,602 | 14,251 |
MMBtu
|
$5.09 |
| Fuel Oil #2 | $11,182 | 1,567 |
MMBtu
|
$7.14 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $70,811 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $70,811 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7226: Use computer programs to optimize hvac performance | $29,757 | $8,500 |
$29,757
1,027,843
kWh
|
- | - | |
| 02 | 2.2425: Use flue gases to heat process or service water | $11,182 | $17,000 | - |
$11,182
-
MMBtu
|
- | |
| 03 | 2.6218: Turn off equipment when not in use | $12,380 | $1,120 |
$12,380
257,913
kWh
|
- | - | |
| 04 | 2.2511: Insulate bare equipment | $3,307 | $840 | - |
$3,307
-
MMBtu
|
- | |
| 05 | 2.4312: Improve lubrication practices | $3,278 | $4,500 |
$3,278
68,288
kWh
|
- | - | |
| 06 | 2.7123: Keep lamps and reflectors clean | $2,594 | - |
$2,406
50,117
kWh
|
- | $188 | |
| 07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,927 | $390 |
$1,927
40,152
kWh
|
- | - | |
| 08 | 2.6232: Install set-back timers | $1,885 | - |
$1,885
39,273
kWh
|
- | - | |
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,501 | $1,340 |
$4,501
93,787
kWh
|
- | - | |
| TOTAL RECOMMENDED | $70,811 | $33,690 |
$56,134
1,577,373
kWh
|
$14,489
-
MMBtu
|
$188 | ||
| TOTAL IMPLEMENTED | $70,811 | $33,690 |
$56,134
1,577,373
kWh
|
$14,489
-
MMBtu
|
$188 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #2 Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs