Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product DRILL CHUCKS
NAICS
n/a
SIC 3545: Cutting Tools, Machine Tool Accessories, and Machinists' Precision Measuring Devices
Sales Range $50
M
to 100
M
# of Employees 445
Plant Area
n/a
Annual Production 8,000,000
pieces
Production Hrs. Annual 7,344
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $518,517 10,741,794
kWh
Natural Gas $72,602 14,251
MMBtu
Fuel Oil #2 $11,182 1,567
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $70,811 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $70,811

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.7226: Use computer programs to optimize hvac performance $29,757 $8,500 $29,757
1,027,843
kWh
- -
02 2.2425: Use flue gases to heat process or service water $11,182 $17,000 - $11,182
-
MMBtu
-
03 2.6218: Turn off equipment when not in use $12,380 $1,120 $12,380
257,913
kWh
- -
04 2.2511: Insulate bare equipment $3,307 $840 - $3,307
-
MMBtu
-
05 2.4312: Improve lubrication practices $3,278 $4,500 $3,278
68,288
kWh
- -
06 2.7123: Keep lamps and reflectors clean $2,594 - $2,406
50,117
kWh
- $188
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,927 $390 $1,927
40,152
kWh
- -
08 2.6232: Install set-back timers $1,885 - $1,885
39,273
kWh
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $4,501 $1,340 $4,501
93,787
kWh
- -
TOTAL RECOMMENDED $70,811 $33,690 $56,134
1,577,373
kWh
$14,489
-
MMBtu
$188
TOTAL IMPLEMENTED $70,811 $33,690 $56,134
1,577,373
kWh
$14,489
-
MMBtu
$188
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings Administrative Changes Savings