ITAC Assessment: TN0400
ITAC logo
ITAC Assessment: TN0400
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product ALCOHOL PADS & IODINE
NAICS
n/a
SIC 2844: Perfumes, Cosmetics, and Other Toilet Preparations
Sales Range $5
M
to 10
M
# of Employees 120
Plant Area
n/a
Annual Production 280,000
pieces
Production Hrs. Annual 4,394
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $106,834 2,019,930
kWh
Natural Gas $27,615 5,670
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,268 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,138

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7226: Use computer programs to optimize hvac performance $12,739 $4,900 $8,481
254,689
kWh
$4,258
-
MMBtu
-
02 2.6121: Reduce hot water temperature to the minimum required $7,297 $13,360 $2,377
44,842
kWh
$4,920
-
MMBtu
-
03 2.7123: Keep lamps and reflectors clean $8,711 $23,808 $8,062
152,110
kWh
- $649
04 2.6232: Install set-back timers $1,755 $6,350 $1,755
33,118
kWh
- -
05 2.6218: Turn off equipment when not in use $1,383 - $1,383
26,084
kWh
- -
06 2.2122: Install / repair insulation on condensate lines $103 $180 - $103
-
MMBtu
-
07 2.2511: Insulate bare equipment $280 $361 $280
5,275
kWh
- -
TOTAL RECOMMENDED $32,268 $48,959 $22,338
516,118
kWh
$9,281
-
MMBtu
$649
TOTAL IMPLEMENTED $3,138 $6,350 $3,138
59,202
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs