ITAC Assessment: TN0399
ITAC logo
ITAC Assessment: TN0399
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product HARDWOOD CHAIRS & TABLES
NAICS
n/a
SIC 2511: Wood Household Furniture, Except Upholstered
Sales Range $5
M
to 10
M
# of Employees 120
Plant Area
n/a
Annual Production 85,000
pieces
Production Hrs. Annual 2,167
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $121,258 1,710,141
kWh
Wood $7,849 18,000
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,368 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,576

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Wood Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $1,222 $2,750 - $1,222
-
MMBtu
02 2.7314: Reduce ventilation air $5,547 $5,692 $4,807
67,702
kWh
$740
-
MMBtu
03 2.2136: Install / repair insulation on steam lines $825 $687 - $825
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,844 $900 $8,844
124,560
kWh
-
05 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads $6,555 $16,100 $6,555
92,321
kWh
-
06 2.7261: Install timers and/or thermostats $1,873 $185 $1,873
26,377
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $416 $96 $416
5,862
kWh
-
08 2.4221: Install compressor air intakes in coolest locations $813 $680 $813
11,430
kWh
-
09 2.6121: Reduce hot water temperature to the minimum required $583 $210 $583
8,206
kWh
-
10 2.3212: Optimize plant power factor $4,690 $5,900 $4,690
-
kWh
-
TOTAL RECOMMENDED $31,368 $33,200 $28,581
336,458
kWh
$2,787
-
MMBtu
TOTAL IMPLEMENTED $14,576 $5,508 $12,529
176,435
kWh
$2,047
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Wood Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs