Assessment Year | 1990 |
---|---|
Principal Product | HARDWOOD CHAIRS & TABLES |
NAICS |
n/a
|
SIC | 2511: Wood Household Furniture, Except Upholstered |
Sales Range | $5 M to 10M |
# of Employees | 120 |
Plant Area |
n/a
|
Annual Production | 85,000
pieces
|
Production Hrs. Annual | 2,167
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $121,258 | 1,710,141 |
kWh
|
$0.071 |
Wood | $7,849 | 18,000 |
MMBtu
|
$0.44 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $31,368 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,576 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Wood Savings |
---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,222 | $2,750 | - |
$1,222
-
MMBtu
|
|
02 | 2.7314: Reduce ventilation air | $5,547 | $5,692 |
$4,807
67,702
kWh
|
$740
-
MMBtu
|
|
03 | 2.2136: Install / repair insulation on steam lines | $825 | $687 | - |
$825
-
MMBtu
|
|
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,844 | $900 |
$8,844
124,560
kWh
|
- | |
05 | 2.6222: Use drying oven (batch type) on alternate days or other optimum schedule to run equipment with full loads | $6,555 | $16,100 |
$6,555
92,321
kWh
|
- | |
06 | 2.7261: Install timers and/or thermostats | $1,873 | $185 |
$1,873
26,377
kWh
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $416 | $96 |
$416
5,862
kWh
|
- | |
08 | 2.4221: Install compressor air intakes in coolest locations | $813 | $680 |
$813
11,430
kWh
|
- | |
09 | 2.6121: Reduce hot water temperature to the minimum required | $583 | $210 |
$583
8,206
kWh
|
- | |
10 | 2.3212: Optimize plant power factor | $4,690 | $5,900 |
$4,690
-
kWh
|
- | |
TOTAL RECOMMENDED | $31,368 | $33,200 |
$28,581
336,458
kWh
|
$2,787
-
MMBtu
|
||
TOTAL IMPLEMENTED | $14,576 | $5,508 |
$12,529
176,435
kWh
|
$2,047
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Wood Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs