ITAC Assessment: TN0398
ITAC logo
ITAC Assessment: TN0398
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product MOBILE HOMES
NAICS
n/a
SIC 2451: Mobile Homes
Sales Range $10
M
to 50
M
# of Employees 220
Plant Area
n/a
Annual Production 2,700
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $114,917 1,398,886
kWh
Fuel Oil #2 $24,373 5,600
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,643 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,396

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.7261: Install timers and/or thermostats $11,814 $1,500 $673
8,206
kWh
$11,141
-
MMBtu
02 2.7226: Use computer programs to optimize hvac performance $2,396 $930 - $2,396
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,211 $870 $2,211
26,964
kWh
-
04 2.4312: Improve lubrication practices $1,250 $1,980 $1,250
15,240
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $913 - $913
11,137
kWh
-
06 2.6211: Conserve energy by efficient use of vending machines $601 $535 $601
7,327
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $458 $380 $458
5,569
kWh
-
TOTAL RECOMMENDED $19,643 $6,195 $6,106
74,443
kWh
$13,537
-
MMBtu
TOTAL IMPLEMENTED $15,396 $2,750 $4,255
51,876
kWh
$11,141
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs