ITAC Assessment: MZ0058
ITAC logo
ITAC Assessment: MZ0058
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product aluminum castings
NAICS 331318: Other Aluminum Rolling, Drawing, and Extruding
SIC 3363: Aluminum Die-Castings
Sales Range $50
M
to 100
M
# of Employees 55
Plant Area 550,000
ft2
Annual Production 50,000,000
lb
Production Hrs. Annual 5,976
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,340,512 20,227,658
kWh
Natural Gas $2,061,035 300,660
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $484,966 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $482,528

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $37,229 $41,660 $37,229
427,583
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $9,522 $22,400 $9,522
109,361
kWh
-
03 2.2437: Recover waste heat from equipment $422,776 $140,000 - $422,776
-
MMBtu
04 2.7492: Use proper thickness of insulation on building envelope $775 $360 - $775
-
MMBtu
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,085 $1,300 $7,085
101,210
kWh
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $5,916 - $5,916
84,517
kWh
-
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,663 - $1,663
23,755
kWh
-
TOTAL RECOMMENDED $484,966 $205,720 $61,415
746,426
kWh
$423,551
-
MMBtu
TOTAL IMPLEMENTED $482,528 $205,360 $59,752
722,671
kWh
$422,776
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs