| Assessment Year | 2010 |
|---|---|
| Principal Product | aluminum castings |
| NAICS | 331318: Other Aluminum Rolling, Drawing, and Extruding |
| SIC | 3363: Aluminum Die-Castings |
| Sales Range | $50 M to 100M |
| # of Employees | 55 |
| Plant Area |
550,000
ft2
|
| Annual Production | 50,000,000
lb
|
| Production Hrs. Annual | 5,976
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,340,512 | 20,227,658 |
kWh
|
$0.066 |
| Natural Gas | $2,061,035 | 300,660 |
MMBtu
|
$6.86 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $484,966 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $482,528 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $37,229 | $41,660 |
$37,229
427,583
kWh
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,522 | $22,400 |
$9,522
109,361
kWh
|
- | |
| 03 | 2.2437: Recover waste heat from equipment | $422,776 | $140,000 | - |
$422,776
-
MMBtu
|
|
| 04 | 2.7492: Use proper thickness of insulation on building envelope | $775 | $360 | - |
$775
-
MMBtu
|
|
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,085 | $1,300 |
$7,085
101,210
kWh
|
- | |
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,916 | - |
$5,916
84,517
kWh
|
- | |
| 07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,663 | - |
$1,663
23,755
kWh
|
- | |
| TOTAL RECOMMENDED | $484,966 | $205,720 |
$61,415
746,426
kWh
|
$423,551
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $482,528 | $205,360 |
$59,752
722,671
kWh
|
$422,776
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs