Assessment Year | 1990 |
---|---|
Principal Product | BREAD, ROLLS AND BUNS |
NAICS |
n/a
|
SIC | 2051: Bread and Other Bakery Products, Except Cookies and Crackers |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
n/a
|
Annual Production | 32,000,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $113,634 | 2,306,858 |
kWh
|
$0.049 |
Natural Gas | $193,107 | 46,072 |
MMBtu
|
$4.19 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $49,982 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $45,837 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $22,575 | $800 | - |
$22,575
-
MMBtu
|
|
02 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $14,221 | $12,000 | - |
$14,221
-
MMBtu
|
|
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $4,145 | $1,000 | - |
$4,145
-
MMBtu
|
|
04 | 2.2136: Install / repair insulation on steam lines | $1,609 | $1,741 | - |
$1,609
-
MMBtu
|
|
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,739 | - |
$4,739
96,717
kWh
|
- | |
06 | 2.2122: Install / repair insulation on condensate lines | $496 | $800 | - |
$496
-
MMBtu
|
|
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,781 | $25,000 |
$1,781
36,342
kWh
|
- | |
08 | 2.4221: Install compressor air intakes in coolest locations | $416 | $820 |
$416
8,499
kWh
|
- | |
TOTAL RECOMMENDED | $49,982 | $42,161 |
$6,936
141,558
kWh
|
$43,046
-
MMBtu
|
||
TOTAL IMPLEMENTED | $45,837 | $41,161 |
$6,936
141,558
kWh
|
$38,901
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs