ITAC Assessment: TN0393
ITAC logo
ITAC Assessment: TN0393
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product BREAD, ROLLS AND BUNS
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area
n/a
Annual Production 32,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $113,634 2,306,858
kWh
Natural Gas $193,107 46,072
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,982 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $45,837

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $22,575 $800 - $22,575
-
MMBtu
02 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $14,221 $12,000 - $14,221
-
MMBtu
03 2.1233: Analyze flue gas for proper air/fuel ratio $4,145 $1,000 - $4,145
-
MMBtu
04 2.2136: Install / repair insulation on steam lines $1,609 $1,741 - $1,609
-
MMBtu
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,739 - $4,739
96,717
kWh
-
06 2.2122: Install / repair insulation on condensate lines $496 $800 - $496
-
MMBtu
07 2.4231: Reduce the pressure of compressed air to the minimum required $1,781 $25,000 $1,781
36,342
kWh
-
08 2.4221: Install compressor air intakes in coolest locations $416 $820 $416
8,499
kWh
-
TOTAL RECOMMENDED $49,982 $42,161 $6,936
141,558
kWh
$43,046
-
MMBtu
TOTAL IMPLEMENTED $45,837 $41,161 $6,936
141,558
kWh
$38,901
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs