Assessment Year | 1989 |
---|---|
Principal Product | ELECTRIC WIRE& CABLE |
NAICS |
n/a
|
SIC | 3315: Steel Wiredrawing and Steel Nails and Spikes |
Sales Range | $50 M to 100M |
# of Employees | 350 |
Plant Area |
n/a
|
Annual Production | 29,184,000
lb
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | Kentucky |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $667,444 | 13,344,666 |
kWh
|
$0.050 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $42,542 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $23,725 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $17,995 | $9,500 |
$17,995
359,906
kWh
|
|
02 | 2.5194: Redesign process | $16,823 | $3,380 |
$16,823
336,460
kWh
|
|
03 | 2.7111: Reduce illumination to minimum necessary levels | $3,664 | - |
$3,664
73,271
kWh
|
|
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,407 | $3,860 |
$1,407
28,136
kWh
|
|
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,143 | - |
$1,143
22,860
kWh
|
|
06 | 2.2515: Use optimum thickness insulation | $851 | $735 |
$851
16,999
kWh
|
|
07 | 2.4221: Install compressor air intakes in coolest locations | $659 | $500 |
$659
13,189
kWh
|
|
TOTAL RECOMMENDED | $42,542 | $17,975 |
$42,542
850,821
kWh
|
||
TOTAL IMPLEMENTED | $23,725 | $13,860 |
$23,725
474,502
kWh
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs