ITAC Assessment: NC0328
ITAC logo
ITAC Assessment: NC0328
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Processed cotton fiber
NAICS 322121: Paper (except Newsprint) Mills
SIC 2399: Fabricated Textile Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 28
Plant Area 350,000
ft2
Annual Production 16,250,000
lb
Production Hrs. Annual 7,800
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $247,243 7,119,907
kWh
Electricity Demand $103,686 12,477
kW-mo/yr
Natural Gas $621,600 72,542
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $155,992 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,069

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.1133: Adjust burners for efficient operation $8,068 $6,225 - - $8,068
-
MMBtu
-
02 2.1331: Burn a less expensive grade of fuel $113,412 $10,000 - - $550,680
-
MMBtu
$(-437,268.0)
03 2.2437: Recover waste heat from equipment $11,962 $7,002 - - $11,962
-
MMBtu
-
04 2.2136: Install / repair insulation on steam lines $10,481 $3,035 - - $10,481
-
MMBtu
-
05 2.7124: Make a practice of turning off lights when not needed $11,954 $480 $8,738
250,380
kWh
$3,216
-
kW-mo/yr
- -
06 2.7134: Use photocell controls $115 $165 $61
1,755
kWh
$54
-
kW-mo/yr
- -
TOTAL RECOMMENDED $155,992 $26,907 $8,799
252,135
kWh
$3,270
-
kW-mo/yr
$581,191
-
MMBtu
$(-437,268.0)
TOTAL IMPLEMENTED $12,069 $645 $8,799
252,135
kWh
$3,270
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs