Assessment Year | 1989 |
---|---|
Principal Product | BLANKETS |
NAICS |
n/a
|
SIC | 2211: Broadwoven Fabric Mills, Cotton |
Sales Range | $5 M to 10M |
# of Employees | 490 |
Plant Area |
n/a
|
Annual Production | 11,000,000
pieces
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $628,239 | 12,383,939 |
kWh
|
$0.051 |
Natural Gas | $221,533 | 121,681 |
MMBtu
|
$1.82 |
Fuel Oil #2 | $39,163 | 8,686 |
MMBtu
|
$4.51 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $43,896 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $19,430 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $6,868 | $5,446 | - |
$4,269
-
MMBtu
|
$2,599
-
MMBtu
|
- | |
02 | 2.7123: Keep lamps and reflectors clean | $16,115 | $44,100 |
$15,605
305,979
kWh
|
- | - | $510 | |
03 | 2.2135: Repair and eliminate steam leaks | $1,909 | $240 | - |
$1,186
-
MMBtu
|
$723
-
MMBtu
|
- | |
04 | 2.2428: Use flue gases in radiant heater for space heating, ovens, etc | $2,350 | $3,325 | - |
$1,460
-
MMBtu
|
$890
-
MMBtu
|
- | |
05 | 2.6232: Install set-back timers | $11,956 | - |
$11,956
234,467
kWh
|
- | - | - | |
06 | 2.2511: Insulate bare equipment | $1,483 | $300 | - |
$922
-
MMBtu
|
$561
-
MMBtu
|
- | |
07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $280 | - | - |
$547
-
MMBtu
|
$333
-
MMBtu
|
$(-600.0) | |
08 | 2.2153: Close off unneeded steam lines | $845 | - | - |
$547
-
MMBtu
|
$298
-
MMBtu
|
- | |
09 | 2.2122: Install / repair insulation on condensate lines | $147 | $50 | - |
$90
-
MMBtu
|
$57
-
MMBtu
|
- | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,943 | $450 |
$1,943
38,101
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $43,896 | $53,911 |
$29,504
578,547
kWh
|
$9,021
-
MMBtu
|
$5,461
-
MMBtu
|
$(-90.0) | ||
TOTAL IMPLEMENTED | $19,430 | $4,065 |
$13,899
272,568
kWh
|
$3,830
-
MMBtu
|
$2,301
-
MMBtu
|
$(-600.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs