ITAC Assessment: TN0367
ITAC logo
ITAC Assessment: TN0367
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product ALUMINUM EXTRUSIONS
NAICS
n/a
SIC 3341: Secondary Smelting and Refining of Nonferrous Metals
Sales Range $50
M
to 100
M
# of Employees 400
Plant Area
n/a
Annual Production 45,000,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,323,199 25,742,966
kWh
Natural Gas $1,559,122 443,575
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $204,821 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $42,683

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2424: Use heat in flue gases to preheat products or materials $112,287 $240,400 - $112,287
-
MMBtu
-
02 2.2414: Use waste heat from hot flue gases to preheat $25,151 $47,160 - $25,151
-
MMBtu
-
03 2.1135: Repair furnaces and oven doors so that they seal efficiently $24,700 $39,800 - $24,700
-
MMBtu
-
04 2.7243: Improve air circulation with destratification fans / other methods $6,986 $14,400 - $6,986
-
MMBtu
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $14,618 $510 $14,618
286,635
kWh
- -
06 2.7141: Lower light fixtures in high ceiling areas $6,876 $20,900 $6,876
134,818
kWh
- -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $6,338 - $6,338
124,267
kWh
- -
08 2.6212: Turn off equipment during breaks, reduce operating time $5,336 $500 $5,336
104,631
kWh
- -
09 2.1233: Analyze flue gas for proper air/fuel ratio $631 - - $931
-
MMBtu
$(-300.0)
10 2.4221: Install compressor air intakes in coolest locations $1,898 $490 $1,898
37,222
kWh
- -
TOTAL RECOMMENDED $204,821 $364,160 $35,066
687,573
kWh
$170,055
-
MMBtu
$(-300.0)
TOTAL IMPLEMENTED $42,683 $36,800 $35,066
687,573
kWh
$7,917
-
MMBtu
$(-300.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs