Assessment Year | 2017 |
---|---|
Principal Product | Filters |
NAICS | 333999: All Other Miscellaneous General Purpose Machinery Manufacturing |
SIC | 3569: General Industrial Machinery and Equipment, Not Elsewhere |
Sales Range | $100 M to 500M |
# of Employees | 125 |
Plant Area |
135,000
ft2
|
Annual Production | 100,000
units
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $70,729 | 2,803,468 |
kWh
|
$0.025 |
Electricity Demand | $130,721 | 7,184 |
kW-mo/yr
|
$18.20 |
Electricity Fees | $11,418 | - |
|
- |
Natural Gas | $2,826 | 936 |
MMBtu
|
$3.02 |
TOTAL YEARLY COSTS | $215,694 | |||
RECOMMENDED SAVINGS* | $35,410 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,460 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.7232: Replace existing hvac unit with high efficiency model | $20,950 | $86,400 |
$8,770
347,958
kWh
|
$12,180
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,959 | $35,776 |
$5,359
212,664
kWh
|
$7,072
-
kW-mo/yr
|
$528 | |
03 | 2.7135: Install occupancy sensors | $899 | $3,000 |
$899
35,671
kWh
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $433 | $1,500 |
$433
17,200
kWh
|
- | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $169 | $200 |
$169
6,693
kWh
|
- | - | |
TOTAL RECOMMENDED | $35,410 | $126,876 |
$15,630
620,186
kWh
|
$19,252
-
kW-mo/yr
|
$528 | ||
TOTAL IMPLEMENTED | $14,460 | $40,476 |
$6,860
272,228
kWh
|
$7,072
-
kW-mo/yr
|
$528 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs