ITAC Assessment: SD0551
ITAC logo
ITAC Assessment: SD0551
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Filters
NAICS 333999: All Other Miscellaneous General Purpose Machinery Manufacturing
SIC 3569: General Industrial Machinery and Equipment, Not Elsewhere
Sales Range $100
M
to 500
M
# of Employees 125
Plant Area 135,000
ft2
Annual Production 100,000
units
Production Hrs. Annual 6,240
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $70,729 2,803,468
kWh
Electricity Demand $130,721 7,184
kW-mo/yr
Electricity Fees $11,418 -
Natural Gas $2,826 936
MMBtu
TOTAL YEARLY COSTS $215,694
RECOMMENDED SAVINGS* $35,410 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,460

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.7232: Replace existing hvac unit with high efficiency model $20,950 $86,400 $8,770
347,958
kWh
$12,180
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $12,959 $35,776 $5,359
212,664
kWh
$7,072
-
kW-mo/yr
$528
03 2.7135: Install occupancy sensors $899 $3,000 $899
35,671
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $433 $1,500 $433
17,200
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $169 $200 $169
6,693
kWh
- -
TOTAL RECOMMENDED $35,410 $126,876 $15,630
620,186
kWh
$19,252
-
kW-mo/yr
$528
TOTAL IMPLEMENTED $14,460 $40,476 $6,860
272,228
kWh
$7,072
-
kW-mo/yr
$528
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs