| Assessment Year | 2003 |
|---|---|
| Principal Product | Metal saw blades |
| NAICS | 332216: Saw Blade and Handtool Manufacturing |
| SIC | 3425: Saw Blades and Handsaws |
| Sales Range | $10 M to 50M |
| # of Employees | 484 |
| Plant Area |
410,000
ft2
|
| Annual Production | 30,000
thousand feet
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Massachusetts |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $971,908 | 11,451,452 |
kWh
|
$0.085 |
| Electricity Demand | $175,104 | 26,107 |
kW-mo/yr
|
$6.71 |
| Electricity Fees | $4,688 | - |
|
- |
| Natural Gas | $176,635 | 25,811 |
MMBtu
|
$6.84 |
| LPG | $8,618 | 1,253 |
MMBtu
|
$6.88 |
| Fuel Oil #2 | $33,092 | 4,826 |
MMBtu
|
$6.86 |
| Fuel Oil #6 | $69,280 | 16,454 |
MMBtu
|
$4.21 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $439,483 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $12,624 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #2 Savings | Water Consumption Savings | By-product Production Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 3.4114: Replace city water with recycled water via cooling tower | $233,841 | $25,050 | n/a | - | - | - | - |
$233,841
-
Tgal
|
- |
| 02 | 4.424: Improve space comfort conditioning | $56,030 | $207,000 | n/a |
$(-29,199.0)
(-349,272)
kWh
|
$(-15,684.0)
-
kW-mo/yr
|
- | - | - | $100,913 |
| 03 | 4.521: Clear and rent existing space | $83,099 | $162,400 |
$2,457
29,784
kWh
|
$277
-
kW-mo/yr
|
- |
$6,365
-
MMBtu
|
- | $74,000 | |
| 04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $30,234 | $30,400 | n/a |
$30,234
420,497
kWh
|
- | - | - | - | - |
| 05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,046 | $9,100 |
$7,046
84,283
kWh
|
- | - | - | - | - | |
| 06 | 2.2437: Recover waste heat from equipment | $8,396 | $9,900 | - | - |
$1,637
-
MMBtu
|
$6,759
-
MMBtu
|
- | - | |
| 07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,661 | $400 |
$9,567
114,492
kWh
|
$1,094
-
kW-mo/yr
|
- | - | - | - | |
| 08 | 2.1223: Install smaller boiler (increase high fire duty cycle) | $8,213 | $26,700 | - | - |
$4,519
-
MMBtu
|
$3,694
-
MMBtu
|
- | - | |
| 09 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,271 | $2,750 |
$1,144
13,682
kWh
|
$127
-
kW-mo/yr
|
- | - | - | - | |
| 10 | 4.821: Pay bills on time to avoid late fees | $692 | $1,275 | - | - | - | - | - | $692 | |
| TOTAL RECOMMENDED | $439,483 | $474,975 |
$21,249
313,466
kWh
|
$(-14,186.0)
-
kW-mo/yr
|
$6,156
-
MMBtu
|
$16,818
-
MMBtu
|
$233,841
-
Tgal
|
$175,605 | ||
| TOTAL IMPLEMENTED | $12,624 | $4,425 |
$10,711
128,174
kWh
|
$1,221
-
kW-mo/yr
|
- | - | - | $692 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #2 Savings | Water Consumption Savings | By-product Production Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs