ITAC Assessment: MA0530
ITAC logo
ITAC Assessment: MA0530
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Metal saw blades
NAICS 332216: Saw Blade and Handtool Manufacturing
SIC 3425: Saw Blades and Handsaws
Sales Range $10
M
to 50
M
# of Employees 484
Plant Area 410,000
ft2
Annual Production 30,000
thousand feet
Production Hrs. Annual 8,760
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $971,908 11,451,452
kWh
Electricity Demand $175,104 26,107
kW-mo/yr
Electricity Fees $4,688 -
Natural Gas $176,635 25,811
MMBtu
LPG $8,618 1,253
MMBtu
Fuel Oil #2 $33,092 4,826
MMBtu
Fuel Oil #6 $69,280 16,454
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $439,483 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,624

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings Water Consumption Savings By-product Production Savings
01 3.4114: Replace city water with recycled water via cooling tower $233,841 $25,050 n/a - - - - $233,841
-
Tgal
-
02 4.424: Improve space comfort conditioning $56,030 $207,000 n/a $(-29,199.0)
(-349,272)
kWh
$(-15,684.0)
-
kW-mo/yr
- - - $100,913
03 4.521: Clear and rent existing space $83,099 $162,400 $2,457
29,784
kWh
$277
-
kW-mo/yr
- $6,365
-
MMBtu
- $74,000
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $30,234 $30,400 n/a $30,234
420,497
kWh
- - - - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,046 $9,100 $7,046
84,283
kWh
- - - - -
06 2.2437: Recover waste heat from equipment $8,396 $9,900 - - $1,637
-
MMBtu
$6,759
-
MMBtu
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,661 $400 $9,567
114,492
kWh
$1,094
-
kW-mo/yr
- - - -
08 2.1223: Install smaller boiler (increase high fire duty cycle) $8,213 $26,700 - - $4,519
-
MMBtu
$3,694
-
MMBtu
- -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,271 $2,750 $1,144
13,682
kWh
$127
-
kW-mo/yr
- - - -
10 4.821: Pay bills on time to avoid late fees $692 $1,275 - - - - - $692
TOTAL RECOMMENDED $439,483 $474,975 $21,249
313,466
kWh
$(-14,186.0)
-
kW-mo/yr
$6,156
-
MMBtu
$16,818
-
MMBtu
$233,841
-
Tgal
$175,605
TOTAL IMPLEMENTED $12,624 $4,425 $10,711
128,174
kWh
$1,221
-
kW-mo/yr
- - - $692
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings Water Consumption Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs