ITAC Assessment: TN0364
ITAC logo
ITAC Assessment: TN0364
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product FLUORESCENT GLASS TUBING
NAICS
n/a
SIC 3229: Pressed and Blown Glass and Glassware, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 380
Plant Area
n/a
Annual Production 53,000,000
ton
Production Hrs. Annual 8,232
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $516,611 16,007,034
kWh
Natural Gas $2,502,318 958,756
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $279,190 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $148,102

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $139,595 - - $139,595
-
MMBtu
-
02 2.2414: Use waste heat from hot flue gases to preheat $112,374 $757,200 - $112,374
-
MMBtu
-
03 2.2163: Use minimum steam operating pressure $15,272 - - $15,272
-
MMBtu
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $5,471 $800 - $6,271
-
MMBtu
$(-800.0)
05 2.2153: Close off unneeded steam lines $3,036 - - $3,036
-
MMBtu
-
06 2.6232: Install set-back timers $3,442 $10,900 $3,442
107,562
kWh
- -
TOTAL RECOMMENDED $279,190 $768,900 $3,442
107,562
kWh
$276,548
-
MMBtu
$(-800.0)
TOTAL IMPLEMENTED $148,102 $800 - $148,902
-
MMBtu
$(-800.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs