ITAC Assessment: LL0216
ITAC logo
ITAC Assessment: LL0216
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Metal Pipe Spools
NAICS 332996: Fabricated Pipe and Pipe Fitting Manufacturing
SIC 3498: Fabricated Pipe and Pipe Fittings
Sales Range $50
M
to 100
M
# of Employees 284
Plant Area 275,000
ft2
Annual Production 78,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $587,749 10,073,967
kWh
Electricity Demand $193,660 35,474
kW-mo/yr
Electricity Fees $32,587 -
Natural Gas $151,153 34,176
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $106,671 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,899

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4239: Eliminate or reduce compressed air usage $29,214 $22,475 $28,036
480,601
kWh
- $1,178 - - -
02 2.7111: Reduce illumination to minimum necessary levels $22,512 $1,410 $18,001
308,547
kWh
$3,604
-
kW-mo/yr
$907 - - -
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $15,873 - - $15,233
-
kW-mo/yr
$640 - - -
04 2.7134: Use photocell controls $5,264 $420 $5,052
86,591
kWh
- $212 - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,613 $840 $1,548
26,531
kWh
- $65 - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,265 $875 $486
8,322
kWh
- $20 - $759 -
07 2.8112: Combine utility meters $1,025 $720 - - $1,025 - - -
08 2.7135: Install occupancy sensors $290 $300 $278
4,757
kWh
- $12 - - -
09 2.8114: Change rate schedules or other changes in utility service $1,445 - - - - $1,445
-
Tgal
- -
10 4.611: Begin a practice of predictive / preventative maintenance $13,500 $2,170 - - - - $11,000 $2,500
11 4.132: Purchase new equipment to reduce material use / cost $12,630 $18,780 - - - - $12,630 -
12 4.611: Begin a practice of predictive / preventative maintenance $2,040 $2,303 - - - - $2,040 -
TOTAL RECOMMENDED $106,671 $50,293 $53,401
915,349
kWh
$18,837
-
kW-mo/yr
$4,059 $1,445
-
Tgal
$26,429 $2,500
TOTAL IMPLEMENTED $33,899 $5,693 $24,601
421,669
kWh
$3,604
-
kW-mo/yr
$2,209 $1,445
-
Tgal
$2,040 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs