ITAC Assessment: UF0102
ITAC logo
ITAC Assessment: UF0102
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Organic Chemicals
NAICS
n/a
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 100,000
ft2
Annual Production 8,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $472,741 7,261,723
kWh
Natural Gas $163,603 33,018
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $69,350 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,168 $1,200 $2,168
33,705
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $677 $2,791 $677
10,551
kWh
-
03 2.7135: Install occupancy sensors $252 $128 $252
4,689
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $404 $600 $404
4,982
kWh
-
05 2.4133: Use most efficient type of electric motors $4,683 $9,153 $4,683
70,047
kWh
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,343 $12,000 $7,343
133,646
kWh
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $29,488 $53,050 $29,488
508,499
kWh
-
08 2.2414: Use waste heat from hot flue gases to preheat $6,270 $2,600 - $6,270
-
MMBtu
09 2.2621: Modify refrigeration system to operate at a lower pressure $18,065 $42,800 $18,065
277,843
kWh
-
TOTAL RECOMMENDED $69,350 $124,322 $63,080
1,043,962
kWh
$6,270
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs