ITAC Assessment: MZ0262
ITAC logo
ITAC Assessment: MZ0262
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Heavy duty heat excahngers
NAICS 332410: Power Boiler and Heat Exchanger Manufacturing
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $50
M
to 100
M
# of Employees 207
Plant Area 150,000
ft2
Annual Production 82,700
units
Production Hrs. Annual 6,000
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $366,289 6,780,500
kWh
Electricity Demand $187,496 19,862
kW-mo/yr
Natural Gas $210,714 78,359
MMBtu
Waste Disposal Costs
Water Usage $15,273 8,055,000
Tgal
Water Disposal $25,554 7,739
Tgal
TOTAL YEARLY COSTS $805,326
RECOMMENDED SAVINGS* $66,140 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,259

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $11,670 $37,061 $7,679
142,000
kWh
$2,685
-
kW-mo/yr
- - - $1,306
02 2.7135: Install occupancy sensors $3,589 $1,350 $2,659
49,428
kWh
$930
-
kW-mo/yr
- - - -
03 2.4221: Install compressor air intakes in coolest locations $1,138 $1,820 $843
15,607
kWh
$295
-
kW-mo/yr
- - - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $3,400 - $2,386
44,183
kWh
$1,014
-
kW-mo/yr
- - - -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $850 - $630
11,675
kWh
$220
-
kW-mo/yr
- - - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,156 $21,621 $7,525
139,352
kWh
$2,631
-
kW-mo/yr
- - - -
07 3.4111: Use closed cycle process to minimize waste water production $32,233 $65,000 $(-1,452.0)
(-26,892)
kWh
$(-508.0)
-
kW-mo/yr
- $12,472
-
Tgal
$21,721
-
Tgal
-
08 2.2442: Preheat combustion air with waste heat $3,104 $8,000 - - $3,104
-
MMBtu
- - -
TOTAL RECOMMENDED $66,140 $134,852 $20,270
375,353
kWh
$7,267
-
kW-mo/yr
$3,104
-
MMBtu
$12,472
-
Tgal
$21,721
-
Tgal
$1,306
TOTAL IMPLEMENTED $15,259 $38,411 $10,338
191,428
kWh
$3,615
-
kW-mo/yr
- - - $1,306
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings One-time Revenue or Avoided Cost Savings