ITAC Assessment: AS0346
ITAC logo
ITAC Assessment: AS0346
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Aerospace and Computer Products
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 28,000
ft2
Annual Production 3,600
units
Production Hrs. Annual 7,296
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $96,830 1,339,080
kWh
Electricity Demand $40,221 2,877
kW-mo/yr
Electricity Fees $13,712 -
Natural Gas $2,943 264
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,160 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,293

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,888 $30 $1,610
23,645
kWh
$278
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,284 $30 $3,654
53,657
kWh
$630
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,718 $9,268 $3,106
45,605
kWh
$612
-
kW-mo/yr
-
04 2.7145: Install skylights $2,387 $5,219 $2,387
35,057
kWh
- -
05 2.7232: Replace existing hvac unit with high efficiency model $1,550 $2,600 n/a $1,323
14,919
kWh
$227
-
kW-mo/yr
-
06 2.7221: Lower temperature during the winter season and vice-versa $121 - $68
1,004
kWh
$53
-
kW-mo/yr
-
07 3.5242: Recover metals from spent solutions and recycle $1,212 $44 - - $1,212
TOTAL RECOMMENDED $15,160 $17,191 $12,148
173,887
kWh
$1,800
-
kW-mo/yr
$1,212
TOTAL IMPLEMENTED $6,293 $60 $5,332
78,306
kWh
$961
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs