ITAC Assessment: TN0363
ITAC logo
ITAC Assessment: TN0363
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product PRESSED GLASSWARE
NAICS
n/a
SIC 3229: Pressed and Blown Glass and Glassware, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 235
Plant Area
n/a
Annual Production 93,000,000
pieces
Production Hrs. Annual 7,896
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $936,989 27,509,965
kWh
Natural Gas $1,474,272 415,988
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $213,825 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $213,825

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $125,794 $1,200 - $125,794
-
MMBtu
-
02 2.2414: Use waste heat from hot flue gases to preheat $57,307 $379,000 - $57,307
-
MMBtu
-
03 2.2111: Install steam trap $8,302 $3,450 - $8,302
-
MMBtu
-
04 2.2163: Use minimum steam operating pressure $3,504 - - $3,504
-
MMBtu
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $8,789 $7,480 $8,789
258,499
kWh
- -
06 2.7123: Keep lamps and reflectors clean $6,829 $21,293 $6,607
194,314
kWh
- $222
07 2.6232: Install set-back timers $2,215 - $2,215
65,064
kWh
- -
08 2.1233: Analyze flue gas for proper air/fuel ratio $1,085 $600 - $1,085
-
MMBtu
-
TOTAL RECOMMENDED $213,825 $413,023 $17,611
517,877
kWh
$195,992
-
MMBtu
$222
TOTAL IMPLEMENTED $213,825 $413,023 $17,611
517,877
kWh
$195,992
-
MMBtu
$222
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs