ITAC Assessment: TN0355
ITAC logo
ITAC Assessment: TN0355
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product JUVENILE WOOD PRODUCTS
NAICS
n/a
SIC 2511: Wood Household Furniture, Except Upholstered
Sales Range $5
M
to 10
M
# of Employees 195
Plant Area
n/a
Annual Production 152,000
pieces
Production Hrs. Annual 3,163
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $95,857 1,126,905
kWh
Natural Gas $37,271 7,780
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $42,438 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,853

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7243: Improve air circulation with destratification fans / other methods $1,038 $18,500 $(-2,322.0)
(-27,257)
kWh
$3,360
-
MMBtu
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,104 $750 $13,104
154,162
kWh
- -
03 2.7123: Keep lamps and reflectors clean $9,501 $19,134 $9,093
106,975
kWh
- $408
04 2.6212: Turn off equipment during breaks, reduce operating time $10,015 $4,840 $10,015
117,819
kWh
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,400 - $3,400
39,859
kWh
- -
06 2.4221: Install compressor air intakes in coolest locations $1,943 $1,220 $1,943
22,860
kWh
- -
07 2.7122: Disconnect ballasts $1,320 $2,321 $1,320
15,533
kWh
- -
08 2.4312: Improve lubrication practices $1,071 - $1,071
12,603
kWh
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $1,046 $360 $1,046
12,309
kWh
- -
TOTAL RECOMMENDED $42,438 $47,125 $38,670
454,863
kWh
$3,360
-
MMBtu
$408
TOTAL IMPLEMENTED $30,853 $9,131 $30,853
362,836
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs