ITAC Assessment: TN0351
ITAC logo
ITAC Assessment: TN0351
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product EXTRUDED PAPER BOARD
NAICS
n/a
SIC 2675: Die-Cut Paper and Paperboard and Cardboard
Sales Range $10
M
to 50
M
# of Employees 240
Plant Area
n/a
Annual Production 300,000
ton
Production Hrs. Annual 8,736
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $923,425 19,734,467
kWh
LPG $259,020 59,073
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $132,441 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $128,309

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings
01 2.2444: Use hot process fluids to preheat incoming process fluids $106,613 $25,500 $42,124
896,249
kWh
$64,489
-
MMBtu
03 2.2614: Use cooling tower or economizer to replace chiller cooling $7,397 $14,940 $7,397
157,386
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $6,130 $3,800 $6,130
130,422
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $4,132 $1,055 $4,132
87,925
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $7,880 $1,800 $7,880
167,644
kWh
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $289 $30 $289
6,155
kWh
-
TOTAL RECOMMENDED $132,441 $47,125 $67,952
1,445,781
kWh
$64,489
-
MMBtu
TOTAL IMPLEMENTED $128,309 $46,070 $63,820
1,357,856
kWh
$64,489
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs