ITAC Assessment: TN0346
ITAC logo
ITAC Assessment: TN0346
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product BAKERY PRODUCTS
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 400
Plant Area
n/a
Annual Production 52,000,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $159,753 3,693,142
kWh
Natural Gas $227,658 43,491
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,395 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,128

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2136: Install / repair insulation on steam lines $14,628 $3,357 - $14,628
-
MMBtu
02 2.7261: Install timers and/or thermostats $11,227 $4,280 $5,772
134,232
kWh
$5,455
-
MMBtu
03 2.1233: Analyze flue gas for proper air/fuel ratio $2,714 $640 - $2,714
-
MMBtu
04 2.2135: Repair and eliminate steam leaks $1,960 $270 - $1,960
-
MMBtu
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,550 $1,850 $4,550
105,803
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,747 - $2,747
63,892
kWh
-
07 2.2511: Insulate bare equipment $1,040 $75 - $1,040
-
MMBtu
08 2.7142: Utilize higher efficiency lamps and/or ballasts $529 $990 $529
12,309
kWh
-
TOTAL RECOMMENDED $39,395 $11,462 $13,598
316,236
kWh
$25,797
-
MMBtu
TOTAL IMPLEMENTED $27,128 $7,107 $7,826
182,004
kWh
$19,302
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs