ITAC Assessment: TN0343
ITAC logo
ITAC Assessment: TN0343
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product MOUNTED BEARINGS
NAICS
n/a
SIC 3562: Ball and Roller Bearings
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area
n/a
Annual Production 2,600,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $759,223 15,456,917
kWh
Natural Gas $53,458 10,180
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $88,132 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $66,649

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7123: Keep lamps and reflectors clean $42,911 $23,701 $42,911
875,733
kWh
02 2.7121: Utilize daylight whenever possible in lieu of artificial light $14,762 $35,660 $14,762
301,290
kWh
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $14,447 $4,500 $14,447
294,842
kWh
04 2.4231: Reduce the pressure of compressed air to the minimum required $6,721 - $6,721
137,163
kWh
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,610 $2,000 $4,610
94,080
kWh
06 2.4221: Install compressor air intakes in coolest locations $3,647 $780 $3,647
74,443
kWh
07 2.6212: Turn off equipment during breaks, reduce operating time $1,034 $1,300 $1,034
21,102
kWh
TOTAL RECOMMENDED $88,132 $67,941 $88,132
1,798,653
kWh
TOTAL IMPLEMENTED $66,649 $32,281 $66,649
1,360,200
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs