ITAC Assessment: SD0038
ITAC logo
ITAC Assessment: SD0038
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product AEROSPACE FASTENERS
NAICS
n/a
SIC 3452: Bolts, Nuts, Screws, Rivets, and Washers
Sales Range $10
M
to 50
M
# of Employees 156
Plant Area
n/a
Annual Production 6,000
pieces
Production Hrs. Annual 4,276
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $223,096 2,068,875
kWh
Natural Gas $9,227 1,377
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,671 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $1,645 $11,530 $1,645
15,240
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $634 $20 $634
5,862
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,307 $950 $1,541
14,361
kWh
$(-234.0)
04 2.7123: Keep lamps and reflectors clean $3,654 $5,250 $3,262
30,188
kWh
$392
05 2.6232: Install set-back timers $750 $909 $602
8,792
kWh
$148
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,681 $2,200 $543
4,982
kWh
$1,138
TOTAL RECOMMENDED $9,671 $20,859 $8,227
79,425
kWh
$1,444
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs