Assessment Year | 1999 |
---|---|
Principal Product | Custom Injection molding |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
60,000
ft2
|
Annual Production | 3,000,000
lb
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $193,175 | 2,919,109 |
kWh
|
$0.066 |
Electricity Demand | $54,713 | 6,842 |
kW-mo/yr
|
$8.00 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $158,666 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $65,712 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7111: Reduce illumination to minimum necessary levels | $1,270 | $800 |
$1,059
15,826
kWh
|
$211
-
kW-mo/yr
|
- | - | |
02 | 2.7144: Install spectral reflectors / delamp | $2,072 | $2,565 |
$1,538
22,860
kWh
|
$534
-
kW-mo/yr
|
- | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,199 | $1,600 |
$1,090
16,413
kWh
|
$109
-
kW-mo/yr
|
- | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $87,415 | $156,300 |
$74,767
1,116,354
kWh
|
$12,648
-
kW-mo/yr
|
- | - | |
05 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $4,340 | $8,500 | - | - | - | $4,340 | |
06 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $8,640 | - | - | - |
$8,640
-
lb
|
- | |
07 | 4.441: Install automatic packing equipment | $8,150 | $9,000 | - | - | - | $8,150 | |
08 | 4.423: Move product using mechanical means | $45,580 | $480 | - | - | - | $45,580 | |
TOTAL RECOMMENDED | $158,666 | $179,245 |
$78,454
1,171,453
kWh
|
$13,502
-
kW-mo/yr
|
$8,640
-
lb
|
$58,070 | ||
TOTAL IMPLEMENTED | $65,712 | $12,845 |
$2,597
38,686
kWh
|
$745
-
kW-mo/yr
|
$8,640
-
lb
|
$53,730 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs