ITAC Assessment: SD0224
ITAC logo
ITAC Assessment: SD0224
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Custom Injection molding
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 60,000
ft2
Annual Production 3,000,000
lb
Production Hrs. Annual 7,200
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $193,175 2,919,109
kWh
Electricity Demand $54,713 6,842
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $158,666 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $65,712

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.7111: Reduce illumination to minimum necessary levels $1,270 $800 $1,059
15,826
kWh
$211
-
kW-mo/yr
- -
02 2.7144: Install spectral reflectors / delamp $2,072 $2,565 $1,538
22,860
kWh
$534
-
kW-mo/yr
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,199 $1,600 $1,090
16,413
kWh
$109
-
kW-mo/yr
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $87,415 $156,300 $74,767
1,116,354
kWh
$12,648
-
kW-mo/yr
- -
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $4,340 $8,500 - - - $4,340
06 3.5212: Regrind, reuse, or sell scrap plastic parts $8,640 - - - $8,640
-
lb
-
07 4.441: Install automatic packing equipment $8,150 $9,000 - - - $8,150
08 4.423: Move product using mechanical means $45,580 $480 - - - $45,580
TOTAL RECOMMENDED $158,666 $179,245 $78,454
1,171,453
kWh
$13,502
-
kW-mo/yr
$8,640
-
lb
$58,070
TOTAL IMPLEMENTED $65,712 $12,845 $2,597
38,686
kWh
$745
-
kW-mo/yr
$8,640
-
lb
$53,730
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs