ITAC Assessment: TN0342
ITAC logo
ITAC Assessment: TN0342
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product BAKERY PRODUCTS
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $5
M
to 10
M
# of Employees 200
Plant Area
n/a
Annual Production 36,000,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $198,178 3,977,140
kWh
Natural Gas $283,290 44,941
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,594 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,510

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2136: Install / repair insulation on steam lines $4,366 $767 - $4,366
-
MMBtu
-
02 2.7243: Improve air circulation with destratification fans / other methods $2,999 $400 - $2,999
-
MMBtu
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $1,301 - - $1,701
-
MMBtu
$(-400.0)
04 2.2437: Recover waste heat from equipment $1,915 $2,882 $1,915
89,097
kWh
- -
05 2.2135: Repair and eliminate steam leaks $1,726 $290 - $1,726
-
MMBtu
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $2,169 - $2,169
43,376
kWh
- -
07 2.6232: Install set-back timers $2,096 - $2,096
41,911
kWh
- -
08 2.4312: Improve lubrication practices $1,084 $450 $1,084
21,688
kWh
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $938 $540 $938
18,757
kWh
- -
TOTAL RECOMMENDED $18,594 $5,329 $8,202
214,829
kWh
$10,792
-
MMBtu
$(-400.0)
TOTAL IMPLEMENTED $14,510 $2,447 $4,118
82,356
kWh
$10,792
-
MMBtu
$(-400.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs