ITAC Assessment: TN0335
ITAC logo
ITAC Assessment: TN0335
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product INDUS. & AUTO INSULATION
NAICS
n/a
SIC 3296: Mineral Wool
Sales Range $10
M
to 50
M
# of Employees 465
Plant Area
n/a
Annual Production 26,400,000
lb
Production Hrs. Annual 8,568
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $489,117 12,623,974
kWh
Natural Gas $742,825 186,851
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $124,769 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $94,457

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7245: Use direct air supply to exhaust hoods $40,900 $36,580 - $40,900
-
MMBtu
-
02 2.2511: Insulate bare equipment $30,312 $4,473 - $30,312
-
MMBtu
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $26,084 - $26,084
668,816
kWh
- -
04 2.1233: Analyze flue gas for proper air/fuel ratio $3,484 - - $4,484
-
MMBtu
$(-1,000.0)
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,710 $210 $8,710
223,329
kWh
- -
06 2.6232: Install set-back timers $2,137 - $2,137
54,807
kWh
- -
07 2.3212: Optimize plant power factor $13,142 $9,400 $13,142
-
kWh
- -
TOTAL RECOMMENDED $124,769 $50,663 $50,073
946,952
kWh
$75,696
-
MMBtu
$(-1,000.0)
TOTAL IMPLEMENTED $94,457 $46,190 $50,073
946,952
kWh
$45,384
-
MMBtu
$(-1,000.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs