ITAC Assessment: TN0334
ITAC logo
ITAC Assessment: TN0334
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product BAKERY PRODUCTS
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 375
Plant Area
n/a
Annual Production 41,600,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $92,271 2,626,612
kWh
Natural Gas $179,190 33,746
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,946 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,872

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2136: Install / repair insulation on steam lines $14,941 $2,726 - $14,941
-
MMBtu
02 2.7123: Keep lamps and reflectors clean $18,074 $37,022 $18,074
516,413
kWh
-
03 2.1123: Install automatic stack damper $2,502 $1,820 - $2,502
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,482 $160 $2,482
70,926
kWh
-
05 2.7261: Install timers and/or thermostats $1,239 $560 $513
14,654
kWh
$726
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $708 $240 $708
20,223
kWh
-
TOTAL RECOMMENDED $39,946 $42,528 $21,777
622,216
kWh
$18,169
-
MMBtu
TOTAL IMPLEMENTED $21,872 $5,506 $3,703
105,803
kWh
$18,169
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs