ITAC Assessment: TN0333
ITAC logo
ITAC Assessment: TN0333
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product FELT-TIP MARKERS ETC.
NAICS
n/a
SIC 3951: Pens, Mechanical Pencils, and Parts
Sales Range $10
M
to 50
M
# of Employees 265
Plant Area
n/a
Annual Production 120,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $307,819 6,232,122
kWh
Natural Gas $5,395 830
MMBtu
Fuel Oil #2 $49,780 13,490
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,903 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,783

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.7261: Install timers and/or thermostats $10,014 $3,720 - $10,014
-
MMBtu
-
02 2.7123: Keep lamps and reflectors clean $15,171 $53,969 $12,307
251,172
kWh
- $2,864
03 2.6232: Install set-back timers $10,455 - $10,455
213,365
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,042 $180 $8,042
164,127
kWh
- -
05 2.2136: Install / repair insulation on steam lines $903 $750 - $903
-
MMBtu
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $150 - - $550
-
MMBtu
$(-400.0)
07 2.2511: Insulate bare equipment $1,120 $252 $1,120
22,860
kWh
- -
08 2.2122: Install / repair insulation on condensate lines $48 $25 - $48
-
MMBtu
-
TOTAL RECOMMENDED $45,903 $58,896 $31,924
651,524
kWh
$11,515
-
MMBtu
$2,464
TOTAL IMPLEMENTED $44,783 $58,644 $30,804
628,664
kWh
$11,515
-
MMBtu
$2,464
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs