ITAC Assessment: TN0332
ITAC logo
ITAC Assessment: TN0332
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product FRESH MUSHROOMS
NAICS
n/a
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area
n/a
Annual Production 20,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $777,054 16,120,751
kWh
Natural Gas $286,409 86,327
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $52,451 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2163: Use minimum steam operating pressure $13,494 - - $13,494
-
MMBtu
02 2.2153: Close off unneeded steam lines $9,055 - - $9,055
-
MMBtu
03 2.7447: Install vinyl strip / high speed / air curtain doors $10,426 $4,205 $4,938
102,872
kWh
$5,488
-
MMBtu
04 2.2136: Install / repair insulation on steam lines $3,369 $1,850 - $3,369
-
MMBtu
05 2.6241: Reduce temperature of process equipment when on standby $3,095 $8,000 - $3,095
-
MMBtu
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $10,959 - $10,959
228,312
kWh
-
07 2.1233: Analyze flue gas for proper air/fuel ratio $2,053 $800 - $2,053
-
MMBtu
TOTAL RECOMMENDED $52,451 $14,855 $15,897
331,184
kWh
$36,554
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs