ITAC Assessment: TN0329
ITAC logo
ITAC Assessment: TN0329
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product ELECTRICAL LOAD CENTERS
NAICS
n/a
SIC 3613: Switchgear and Switchboard Apparatus
Sales Range $50
M
to 100
M
# of Employees 357
Plant Area
n/a
Annual Production 250,000
pieces
Production Hrs. Annual 5,760
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $666,131 13,095,545
kWh
Natural Gas $118,410 29,265
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,122 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,811

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7121: Utilize daylight whenever possible in lieu of artificial light $5,964 $19,684 $5,964
116,940
kWh
-
02 2.2614: Use cooling tower or economizer to replace chiller cooling $5,471 $2,193 $5,471
107,268
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,753 $615 $4,753
93,200
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,619 - $4,619
90,563
kWh
-
05 2.7243: Improve air circulation with destratification fans / other methods $1,783 $3,300 $1,435
28,136
kWh
$348
-
MMBtu
06 2.4221: Install compressor air intakes in coolest locations $1,824 $1,180 $1,824
35,756
kWh
-
07 2.4312: Improve lubrication practices $1,824 - $1,824
35,756
kWh
-
08 2.2511: Insulate bare equipment $1,151 $566 $1,151
22,567
kWh
-
09 2.2511: Insulate bare equipment $1,106 $146 $1,106
21,688
kWh
-
10 2.2514: Cover open tanks $252 - - $252
-
MMBtu
11 2.2511: Insulate bare equipment $196 $561 - $196
-
MMBtu
12 2.2521: Isolate steam lines to avoid heating air conditioned areas $179 $600 $179
3,517
kWh
-
TOTAL RECOMMENDED $29,122 $28,845 $28,326
555,391
kWh
$796
-
MMBtu
TOTAL IMPLEMENTED $21,811 $8,034 $21,211
415,884
kWh
$600
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs