ITAC Assessment: TN0326
ITAC logo
ITAC Assessment: TN0326
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product INDUSTRIAL VALVES
NAICS
n/a
SIC 3491: Industrial Valves
Sales Range $10
M
to 50
M
# of Employees 230
Plant Area
n/a
Annual Production 83,000
pieces
Production Hrs. Annual 6,120
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $263,326 5,101,993
kWh
Natural Gas $64,761 14,112
MMBtu
LPG $7,650 1,035
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,173 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,565

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings LPG Savings
01 2.2135: Repair and eliminate steam leaks $3,984 $300 - $3,984
-
MMBtu
-
02 2.7261: Install timers and/or thermostats $4,339 $2,160 - $3,018
-
MMBtu
$1,321
-
MMBtu
03 2.2136: Install / repair insulation on steam lines $3,432 $1,442 - $3,432
-
MMBtu
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,072 $960 $8,072
158,265
kWh
- -
05 2.2414: Use waste heat from hot flue gases to preheat $1,918 $4,980 - $1,918
-
MMBtu
-
06 2.7243: Improve air circulation with destratification fans / other methods $2,024 $6,761 - $1,408
-
MMBtu
$616
-
MMBtu
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,749 - $1,749
34,291
kWh
- -
08 2.4312: Improve lubrication practices $1,666 - $1,666
32,532
kWh
- -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $2,989 $600 $2,989
58,617
kWh
- -
TOTAL RECOMMENDED $30,173 $17,203 $14,476
283,705
kWh
$13,760
-
MMBtu
$1,937
-
MMBtu
TOTAL IMPLEMENTED $24,565 $5,462 $12,810
251,173
kWh
$10,434
-
MMBtu
$1,321
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs