ITAC Assessment: WI0138
ITAC logo
ITAC Assessment: WI0138
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product ICE CREAM
NAICS
n/a
SIC 2024: Ice Cream and Frozen Desserts
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area
n/a
Annual Production 14,000
Tgal
Production Hrs. Annual 4,250
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $615,519 8,233,881
kWh
Natural Gas $87,444 34,107
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,380 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,737

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $19,710 $12,800 $19,710
263,775
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,678 $2 $3,494
46,600
kWh
- $(-816.0)
03 2.6232: Install set-back timers $1,429 $200 $1,441
19,343
kWh
- $(-12.0)
04 2.3132: Recharge batteries on during off-peak demand periods $2,643 $5,000 $2,643
-
kWh
- -
05 2.1233: Analyze flue gas for proper air/fuel ratio $2,342 $500 - $2,342
-
MMBtu
-
06 2.2135: Repair and eliminate steam leaks $247 $200 - $247
-
MMBtu
-
07 2.2511: Insulate bare equipment $331 $168 $331
4,396
kWh
- -
TOTAL RECOMMENDED $29,380 $18,870 $27,619
334,114
kWh
$2,589
-
MMBtu
$(-828.0)
TOTAL IMPLEMENTED $26,737 $13,870 $24,976
334,114
kWh
$2,589
-
MMBtu
$(-828.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs