ITAC Assessment: TN0321
ITAC logo
ITAC Assessment: TN0321
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product INDUS. AUTOMOTIVE PARTS
NAICS
n/a
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 96
Plant Area
n/a
Annual Production 8,000,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $120,827 2,293,083
kWh
Natural Gas $24,513 4,597
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,648 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,126

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7492: Use proper thickness of insulation on building envelope $9,567 $3,500 - $9,567
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,710 $180 $6,710
126,612
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,320 $432 $1,320
24,912
kWh
-
04 2.2437: Recover waste heat from equipment $795 $300 - $795
-
MMBtu
05 2.6214: Shut off pilots in standby equipment $769 - - $769
-
MMBtu
06 2.6212: Turn off equipment during breaks, reduce operating time $2,004 - $2,004
37,808
kWh
-
07 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,522 $5,544 $1,522
28,722
kWh
-
08 2.4231: Reduce the pressure of compressed air to the minimum required $1,072 $800 $1,072
20,223
kWh
-
09 2.2511: Insulate bare equipment $885 $615 $885
16,706
kWh
-
10 2.4221: Install compressor air intakes in coolest locations $823 $470 $823
15,533
kWh
-
11 2.6242: Minimize operation of equipment maintained in standby condition $715 $475 $715
13,482
kWh
-
12 2.4111: Utilize energy-efficient belts and other improved mechanisms $466 - $466
8,792
kWh
-
TOTAL RECOMMENDED $26,648 $12,316 $15,517
292,790
kWh
$11,131
-
MMBtu
TOTAL IMPLEMENTED $25,126 $6,772 $13,995
264,068
kWh
$11,131
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs