ITAC Assessment: TN0318
ITAC logo
ITAC Assessment: TN0318
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product PETROL & DRY BULK TANKER
NAICS
n/a
SIC 3731: Ship Building and Repairing
Sales Range $10
M
to 50
M
# of Employees 165
Plant Area
n/a
Annual Production 840
pieces
Production Hrs. Annual 5,824
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $105,658 1,968,054
kWh
Fuel Oil #2 $15,547 4,326
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,246 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,461

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.7121: Utilize daylight whenever possible in lieu of artificial light $2,785 $13,912 $2,785
51,583
kWh
-
02 2.2437: Recover waste heat from equipment $489 $700 - $489
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,614 $195 $1,614
29,894
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $601 - $601
11,137
kWh
-
05 2.6232: Install set-back timers $506 - $506
9,379
kWh
-
06 2.2163: Use minimum steam operating pressure $93 - - $93
-
MMBtu
07 2.4312: Improve lubrication practices $158 $300 $158
2,931
kWh
-
TOTAL RECOMMENDED $6,246 $15,107 $5,664
104,924
kWh
$582
-
MMBtu
TOTAL IMPLEMENTED $3,461 $1,195 $2,879
53,341
kWh
$582
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs