| Assessment Year | 1987 |
|---|---|
| Principal Product | PETROL & DRY BULK TANKER |
| NAICS |
n/a
|
| SIC | 3731: Ship Building and Repairing |
| Sales Range | $10 M to 50M |
| # of Employees | 165 |
| Plant Area |
n/a
|
| Annual Production | 840
pieces
|
| Production Hrs. Annual | 5,824
hrs
|
| Location (State) | Tennessee |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $105,658 | 1,968,054 |
kWh
|
$0.054 |
| Fuel Oil #2 | $15,547 | 4,326 |
MMBtu
|
$3.59 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $6,246 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $3,461 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $2,785 | $13,912 |
$2,785
51,583
kWh
|
- | |
| 02 | 2.2437: Recover waste heat from equipment | $489 | $700 | - |
$489
-
MMBtu
|
|
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,614 | $195 |
$1,614
29,894
kWh
|
- | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $601 | - |
$601
11,137
kWh
|
- | |
| 05 | 2.6232: Install set-back timers | $506 | - |
$506
9,379
kWh
|
- | |
| 06 | 2.2163: Use minimum steam operating pressure | $93 | - | - |
$93
-
MMBtu
|
|
| 07 | 2.4312: Improve lubrication practices | $158 | $300 |
$158
2,931
kWh
|
- | |
| TOTAL RECOMMENDED | $6,246 | $15,107 |
$5,664
104,924
kWh
|
$582
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $3,461 | $1,195 |
$2,879
53,341
kWh
|
$582
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #2 Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs