Assessment Year | 1987 |
---|---|
Principal Product | AUTOMOTIVE PARTS |
NAICS |
n/a
|
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $10 M to 50M |
# of Employees | 250 |
Plant Area |
n/a
|
Annual Production | 9,600,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $360,145 | 7,233,881 |
kWh
|
$0.050 |
Natural Gas | $25,055 | 6,358 |
MMBtu
|
$3.94 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $28,704 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $24,117 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $5,316 | $3,880 | - |
$5,316
-
MMBtu
|
|
02 | 2.2511: Insulate bare equipment | $8,265 | $346 |
$8,265
165,299
kWh
|
- | |
03 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $5,598 | $3,000 |
$5,598
111,958
kWh
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,370 | $375 |
$3,370
67,409
kWh
|
- | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,491 | - |
$2,491
49,824
kWh
|
- | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,568 | $280 |
$1,568
31,360
kWh
|
- | |
07 | 2.2532: Use only amount of air necessary to prevent explosion hazard | $1,202 | $2,800 |
$1,202
24,033
kWh
|
- | |
08 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $894 | $1,776 |
$894
17,878
kWh
|
- | |
TOTAL RECOMMENDED | $28,704 | $12,457 |
$23,388
467,761
kWh
|
$5,316
-
MMBtu
|
||
TOTAL IMPLEMENTED | $24,117 | $7,881 |
$18,801
376,026
kWh
|
$5,316
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs