ITAC Assessment: TN0310
ITAC logo
ITAC Assessment: TN0310
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product WOODEN FURNITURE, LUMBER
NAICS
n/a
SIC 2519: Household Furniture, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 100
Plant Area
n/a
Annual Production 1,500
thousand feet
Production Hrs. Annual 1,920
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $276,535 4,373,974
kWh
Wood $30,600 58,480
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,330 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,785

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Wood Savings
01 2.7212: Install or upgrade insulation on hvac distribution systems $2,545 $7,600 - $2,545
-
MMBtu
02 2.1233: Analyze flue gas for proper air/fuel ratio $2,433 $600 - $2,433
-
MMBtu
03 2.2163: Use minimum steam operating pressure $571 - - $571
-
MMBtu
04 2.6212: Turn off equipment during breaks, reduce operating time $13,110 - $13,110
208,089
kWh
-
05 2.2136: Install / repair insulation on steam lines $86 $100 - $86
-
MMBtu
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,216 $880 $2,216
35,170
kWh
-
07 2.6232: Install set-back timers $369 - $369
5,862
kWh
-
TOTAL RECOMMENDED $21,330 $9,180 $15,695
249,121
kWh
$5,635
-
MMBtu
TOTAL IMPLEMENTED $18,785 $1,580 $15,695
249,121
kWh
$3,090
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Wood Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs