ITAC Assessment: TN0306
ITAC logo
ITAC Assessment: TN0306
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product TILLAGE IMPLEMENTS-FARM
NAICS
n/a
SIC 3523: Farm Machinery and Equipment
Sales Range $5
M
to 10
M
# of Employees 68
Plant Area
n/a
Annual Production 10,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $46,293 661,489
kWh
Natural Gas $4,423 805
MMBtu
Fuel Oil #2 $19,120 3,266
MMBtu
Other Energy $788 107
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,204 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,204

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $1,664 $1,743 - $418
-
MMBtu
$1,246
-
MMBtu
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $397 - - - $1,072
-
MMBtu
$(-675.0)
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,231 $150 $1,231
17,585
kWh
- - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $522 $3,600 $522
7,327
kWh
- - -
05 2.7111: Reduce illumination to minimum necessary levels $390 - $390
5,569
kWh
- - -
TOTAL RECOMMENDED $4,204 $5,493 $2,143
30,481
kWh
$418
-
MMBtu
$2,318
-
MMBtu
$(-675.0)
TOTAL IMPLEMENTED $4,204 $5,493 $2,143
30,481
kWh
$418
-
MMBtu
$2,318
-
MMBtu
$(-675.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs