ITAC Assessment: TN0301
ITAC logo
ITAC Assessment: TN0301
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product CONSUMER APPLIANCE PARTS
NAICS
n/a
SIC 3634: Electric Housewares and Fans
Sales Range $10
M
to 50
M
# of Employees 103
Plant Area
n/a
Annual Production 7,000,000
pieces
Production Hrs. Annual 4,335
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $35,794 591,735
kWh
Natural Gas $20,061 3,654
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,152 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,832

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7243: Improve air circulation with destratification fans / other methods $1,386 $6,000 $(-270.0)
(-4,396)
kWh
$1,656
-
MMBtu
02 2.6214: Shut off pilots in standby equipment $1,628 - - $1,628
-
MMBtu
03 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $3,200 $400 $3,200
53,341
kWh
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,618 $75 $1,618
26,964
kWh
-
05 2.6232: Install set-back timers $320 $445 $320
5,275
kWh
-
TOTAL RECOMMENDED $8,152 $6,920 $4,868
81,184
kWh
$3,284
-
MMBtu
TOTAL IMPLEMENTED $7,832 $6,475 $4,548
75,909
kWh
$3,284
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs