ITAC Assessment: TN0264
ITAC logo
ITAC Assessment: TN0264
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product SMALL KITCHEN APPLIANCES
NAICS
n/a
SIC 3634: Electric Housewares and Fans
Sales Range $10
M
to 50
M
# of Employees 400
Plant Area
n/a
Annual Production 1,500,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $435,511 10,415,006
kWh
Natural Gas $15,790 2,721
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,975 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2511: Insulate bare equipment $7,624 $1,400 $9,747
233,001
kWh
$(-2,123.0)
-
MMBtu
02 2.7111: Reduce illumination to minimum necessary levels $8,827 $4,000 $8,827
211,020
kWh
-
03 2.7243: Improve air circulation with destratification fans / other methods $6,044 $13,200 $3,678
87,925
kWh
$2,366
-
MMBtu
04 2.2692: Use outside cold water source as a supply of cooling water $5,480 $12,000 $5,480
131,008
kWh
-
TOTAL RECOMMENDED $27,975 $30,600 $27,732
662,954
kWh
$243
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs