ITAC Assessment: LL0142
ITAC logo
ITAC Assessment: LL0142
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Bread
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 186
Plant Area 87,135
ft2
Annual Production 65,214,784
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $370,189 6,426,800
kWh
Electricity Fees $29,256 -
Natural Gas $311,724 41,889
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,755 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,062

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Solid Waste (non-haz) Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,508 $3,000 $8,188
142,497
kWh
$320 -
02 2.7111: Reduce illumination to minimum necessary levels $7,986 - $7,679
133,311
kWh
$307 -
03 2.2511: Insulate bare equipment $554 $289 - - $554
-
lb
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $406 $45 $390
6,789
kWh
$16 -
05 3.5313: Increase amount of waste recovered for resale $14,301 - - - $14,301
-
lb
TOTAL RECOMMENDED $31,755 $3,334 $16,257
282,597
kWh
$643 $14,855
-
lb
TOTAL IMPLEMENTED $9,062 $3,289 $8,188
142,497
kWh
$320 $554
-
lb
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs