ITAC Assessment: TN0296
ITAC logo
ITAC Assessment: TN0296
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product REAR VIEW TRUCK MIRRORS
NAICS
n/a
SIC 3231: Glass Products, Made of Purchased Glass
Sales Range $10
M
to 50
M
# of Employees 285
Plant Area
n/a
Annual Production 3,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $256,095 5,325,616
kWh
Natural Gas $118,999 22,659
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,315 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,650

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7492: Use proper thickness of insulation on building envelope $7,812 $25,175 - $7,812
-
MMBtu
02 2.7261: Install timers and/or thermostats $6,477 $2,580 - $6,477
-
MMBtu
03 2.7243: Improve air circulation with destratification fans / other methods $2,236 - - $2,236
-
MMBtu
04 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $3,601 - $3,601
75,029
kWh
-
05 2.2511: Insulate bare equipment $853 $596 - $853
-
MMBtu
06 2.4221: Install compressor air intakes in coolest locations $1,336 $260 $1,336
27,843
kWh
-
TOTAL RECOMMENDED $22,315 $28,611 $4,937
102,872
kWh
$17,378
-
MMBtu
TOTAL IMPLEMENTED $13,650 $2,840 $4,937
102,872
kWh
$8,713
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs