ITAC Assessment: TN0291
ITAC logo
ITAC Assessment: TN0291
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product MILK, BUTTERMILK, ETC.
NAICS
n/a
SIC 2026: Fluid Milk
Sales Range $10
M
to 50
M
# of Employees 134
Plant Area
n/a
Annual Production 14,000,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $187,747 3,738,863
kWh
Natural Gas $53,661 14,646
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,974 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,321

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2447: Heat water with exhaust heat $13,649 $22,800 - $13,649
-
MMBtu
-
02 2.2136: Install / repair insulation on steam lines $9,590 $1,809 - $9,590
-
MMBtu
-
03 2.2163: Use minimum steam operating pressure $3,004 - - $3,004
-
MMBtu
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $518 - - $818
-
MMBtu
$(-300.0)
05 2.2511: Insulate bare equipment $2,828 $4,867 $2,828
56,565
kWh
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,828 $375 $2,828
56,565
kWh
- -
07 2.4221: Install compressor air intakes in coolest locations $557 $295 $557
11,137
kWh
- -
TOTAL RECOMMENDED $32,974 $30,146 $6,213
124,267
kWh
$27,061
-
MMBtu
$(-300.0)
TOTAL IMPLEMENTED $16,321 $7,346 $6,213
124,267
kWh
$10,408
-
MMBtu
$(-300.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs