ITAC Assessment: TN0290
ITAC logo
ITAC Assessment: TN0290
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product WORK PANTS
NAICS
n/a
SIC 2326: Men's and Boys' Work Clothing
Sales Range $500
k
to 1
M
# of Employees 375
Plant Area
n/a
Annual Production 2,419,200
pieces
Production Hrs. Annual 2,040
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $92,965 1,300,997
kWh
Natural Gas $33,403 7,052
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,179 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,979

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7262: Separate controls of air handlers from ac/ heating systems $8,544 $9,080 $8,544
119,578
kWh
-
02 2.4322: Use or replace with energy efficient substitutes $1,673 $3,100 - $1,673
-
MMBtu
03 2.2437: Recover waste heat from equipment $948 $1,885 - $948
-
MMBtu
04 2.7111: Reduce illumination to minimum necessary levels $3,162 - $3,162
44,256
kWh
-
05 2.1222: Install turbulators $469 $500 - $469
-
MMBtu
06 2.2122: Install / repair insulation on condensate lines $90 $50 - $90
-
MMBtu
07 2.6242: Minimize operation of equipment maintained in standby condition $293 $500 $293
4,103
kWh
-
TOTAL RECOMMENDED $15,179 $15,115 $11,999
167,937
kWh
$3,180
-
MMBtu
TOTAL IMPLEMENTED $10,979 $13,180 $8,837
123,681
kWh
$2,142
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs