Assessment Year | 1986 |
---|---|
Principal Product | HVAC FILTER ENCLOSURES |
NAICS |
n/a
|
SIC | 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment |
Sales Range | $10 M to 50M |
# of Employees | 180 |
Plant Area |
n/a
|
Annual Production | 100,000
pieces
|
Production Hrs. Annual | 5,880
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $122,884 | 2,432,005 |
kWh
|
$0.051 |
Natural Gas | $55,381 | 10,290 |
MMBtu
|
$5.38 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $13,822 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,000 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.6212: Turn off equipment during breaks, reduce operating time | $8,871 | $4,270 |
$8,871
175,557
kWh
|
- | - | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $556 | - | - |
$1,356
-
MMBtu
|
$(-800.0) | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,088 | $165 |
$2,088
41,325
kWh
|
- | - | |
04 | 2.6212: Turn off equipment during breaks, reduce operating time | $889 | - |
$889
17,585
kWh
|
- | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $822 | $540 |
$822
16,120
kWh
|
- | - | |
06 | 2.4227: Use compressor air filters | $285 | - |
$385
7,620
kWh
|
- | $(-100.0) | |
07 | 2.6121: Reduce hot water temperature to the minimum required | $311 | - |
$311
6,155
kWh
|
- | - | |
TOTAL RECOMMENDED | $13,822 | $4,975 |
$13,366
264,362
kWh
|
$1,356
-
MMBtu
|
$(-900.0) | ||
TOTAL IMPLEMENTED | $13,000 | $4,435 |
$12,544
248,242
kWh
|
$1,356
-
MMBtu
|
$(-900.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs